Process

We are your partner throughout the entire construction process. From the design to the handover of the finished building.

111
222

Comprehensive solutions

All stages of building construction are handled by us. Therefore, we are able to guarantee that we will finish the building faster than traditional construction companies.

znacznik

1.

cfsdcfsdcfsd

Need

Modular construction enables buildings to be erected faster than traditional construction. And it has many applications. This technology can be used to build a hospital that will last for years. We can also create a catering facility, which will be moved to a new location after the season ends. This all depends entirely on the needs of the investor.

2.

666

DESIGN WITH US!

Are you an architect focused on designing modular buildings? Send us a message. We are eager to connect with professionals who wish to create with MOD21 a new formula for the future of construction.

JOIN US

Design

We can provide ready-made designs as well as assistance from architects specialising in modular construction. This ensures that the building erected meets all expectations. Whether it is a matter of investor preference or complying with a zoning plan. The design phase requires approximately 2 months.

In the production hall, we have the ability to constantly monitor the construction process. Therefore, the quality of modular construction is significantly higher than the standard that can be achieved on the building site.

Theodor Kaczmarczyk
MOD21

3.

2023-08-18_MOD21-Produktionsshooting_Foto_Lukasz-Piecyk_DSC9159_1024px2023-08-18_MOD21-Produktionsshooting_Foto_Lukasz-Piecyk_DSC9159_1024px2023-08-18_MOD21-Produktionsshooting_Foto_Lukasz-Piecyk_DSC9159_1024px

Production

Timber cutting, machine assembly of the module on the production line, finishing. All this occurs under the manufacturing plant roof. It takes 17 days from the start of the production process until the module is delivered to the construction site. The finished module includes everything but the furniture.

4.

2023-Modulstellung_Gemeinschaftsunterkunft-M_20230901-hamann-media-gbr-0775_1024px2023-Modulstellung_Gemeinschaftsunterkunft-M_20230901-hamann-media-gbr-0775_1024px2023-Modulstellung_Gemeinschaftsunterkunft-M_20230901-hamann-media-gbr-0775_1024px

Construction site

On the construction site, the building is assembled from prepared modules. Then the facades and roofs have to be connected, the gas and hydraulic systems have to be installed and the lifts constructed. The finishing work is expected to take about 2 months.

5.

Showroom-web_49Showroom-web_49Showroom-web_49
znacznik

Building commissioning

The finished building will then be handed over to the investor. In terms of usability, insulation or safety standards, it does not differ from a traditional construction. Apart from the fact that it can be used significantly sooner.